Abstract
ISO/IEC 27001:2022 runs to 19 pages, and its climate amendment to one, yet building an ISMS that passes certification against them is a long project. Why? The clause layout and much of the core text of Clauses 4 to 10 follow the harmonized structure that ISO management system standards share. The main ISMS-specific workflow sits in four subclauses: a repeatable risk assessment with defined criteria and named risk owners (6.1.2), a treatment process that compares the chosen controls with Annex A and records them in a Statement of Applicability (6.1.3), and the operation of both (8.2, 8.3). Around that workflow the standard asks for determinations and evidence: a documented scope that accounts for interfaces and dependencies, objectives that are monitored, a planned internal audit programme, and management reviews that produce decisions. The 2024 amendment adds one sentence to 4.1 and one note to 4.2; certification bodies check that a climate determination was made and that the process behind it works. In its 2018 audit sample, one certification body observed risk methods without consistent scales, and gave examples of incorrectly justified exclusions and treatment plans without deadlines or responsibilities. A clause-by-clause checklist closes the article.
Nineteen pages, a long project
ISO/IEC 27001:2022 (opens in a new tab) is short. On 27 November 2026 ISO’s catalogue listed it at 19 pages, against 152 pages for the control guidance in ISO/IEC 27002:2022.12 Its one amendment, ISO/IEC 27001:2022/Amd 1:2024 (opens in a new tab), Climate action changes, is a single page.3 The companion article on this site, a field guide to the ISO/IEC 27000 family, covers the family map, the 2013 to 2022 change list, the IAF transition timetable and what a certificate tells a customer. This article goes one level down, to what Clauses 4 to 10 demand of the people who run and audit an ISMS.
The brevity misleads because the requirements interlock. The standard sets separate obligations for scope (4.3), risk assessment (6.1.2), treatment and the Statement of Applicability (SoA) (6.1.3), and their operation (8.2, 8.3); the SoA must justify the inclusion of each necessary control, which can rest on a risk or on a legal or contractual need.45 An auditor will often follow one example trail: from an SoA line to its justification, to the risk criteria and the owner who approved the treatment plan, and forward to evidence that the control operates. The worked example below shows one such trail.
The standard warns readers about one trap in its introduction: the order in which requirements appear “does not reflect their importance or imply the order in which they are to be implemented”.6 Its scope sentence sets the bar: excluding any of the requirements in Clauses 4 to 10 “is not acceptable when an organization claims conformity”.6 Annex A is normative, but its controls apply through the risk process, as described below.7
The skeleton: shared structure and ISMS-specific provisions
What the harmonized structure fixes
ISO management system standards are written to a common template. ISO’s Joint Technical Coordination Group (JTCG) for management system standards describes “a harmonized structure that provides common clauses and core text for all MSS”.8 Its explanatory page says the harmonized approach is set out in Annex Q of the ISO/IEC Directives, Part 1:2026, with the harmonized structure itself in an amendment to that document, and that the structure fixes identical clause numbers in the same sequence, clause titles, common terms and core definitions, and core text, “including requirements and notes”.9 Committees may add discipline-specific requirements and “use a definition of risk that is tailored to their context”, but not contradict or repeat the shared text.9 ISO’s own explanation is that this helps organizations run one integrated system against several standards.10
ISO/IEC 27001:2022 says it applies “the high-level structure, identical sub-clause titles, identical text, common terms, and core definitions defined in Annex SL”, and its foreword names alignment with the harmonized structure and with ISO/IEC 27002:2022 as the main changes from 2013.6 IAF’s transition document treated the move from the older high-level structure to the harmonized structure as “a minor revision”, with most changes editorial.7 (IAF ceased operations on 1 January 2026 and its role passed to Global Accreditation Cooperation Incorporated, Global ACI; specified IAF documents remain in use until Global ACI adopts equivalents, so MD 26 is cited here as the historical transition rule.1112)
Where the ISMS-specific provisions sit
The public contents pages of three SC 27 and SC 42 management system standards make the shared structure visible. ISO/IEC 27001:2022, ISO/IEC 27701:2025 and ISO/IEC 42001:2023 share a numbered structure from 4.1 to 10.2, with deviations: 42001 adds subclauses (6.1.4 and 8.4), 27701 adds a Clause 11 on its annexes, and titles differ beyond the discipline name, as in 27701’s “Roles, responsibilities and authorities” against 27001’s “Organizational roles, responsibilities and authorities”, or “AI policy” and “Privacy policy” against 27001’s “Policy”.61314
| Clause | ISO/IEC 27001:2022 | ISO/IEC 27701:2025 | ISO/IEC 42001:2023 |
|---|---|---|---|
| 6.1.2 | Information security risk assessment | Privacy risk assessment | AI risk assessment |
| 6.1.3 | Information security risk treatment | Privacy risk treatment | AI risk treatment |
| 6.1.4 | none | none | AI system impact assessment |
| 8.2 | Information security risk assessment | Privacy risk assessment | AI risk assessment |
| 8.3 | Information security risk treatment | Privacy risk treatment | AI risk treatment |
| 8.4 | none | none | AI system impact assessment |
| Annex A (normative) | Information security controls reference | PIMS reference control objectives and controls for PII controllers and PII processors | Reference control objectives and controls |
The 42001 introduction describes the arrangement: the shared structure plus “requirements specific to managing the issues and risks arising from using AI”.14
For 27001, the four risk subclauses, 6.1.2, 6.1.3, 8.2 and 8.3, form the main risk workflow, with Annex A as the reference set used inside 6.1.3. They are not the only ISMS-specific text. Shared clauses also carry information security provisions: 6.2 c), for example, requires information security objectives to take into account applicable information security requirements and risk assessment and treatment results, and 9.3.2 f) makes the results of risk assessment and the status of the risk treatment plan a management review input.1516 How much of each clause is identical core text cannot be measured from the public previews; the harmonized structure text with guidance is published by ISO as a separate committee document.9
What an organization already running ISO 9001 or ISO 22301 can reuse depends on its existing scope and processes. An existing internal audit programme, for example, can be extended to cover the ISMS and its security-specific requirements, and an existing management review can take on the 9.3.2 inputs.
Clause 4: context of the organization
4.1, 4.2 and 4.4: issues, interested parties and processes
Clause 4.1 requires the organization to determine the external and internal issues that are relevant to its purpose and affect its ability to achieve the intended results of the ISMS. Clause 4.2 requires it to determine the interested parties relevant to the ISMS and their relevant requirements.17 The 2022 edition added item 4.2 c), which IAF summarizes as a requirement “to determine the requirements of the interested parties addressed through” the ISMS.7 NQA, a certification body, describes the practical change: the organization must be able to show which interested parties’ requirements its ISMS addresses.18
NQA suggests evidence such as a SWOT or PESTLE analysis or a high-level business risk assessment.17 Illustration: a contractual 24-hour breach notification duty is a 4.2 requirement; if 4.2 c) brings it into the ISMS, it should show in the incident process.
Clause 4.4 requires the organization to establish, implement, maintain and continually improve an ISMS, “including the processes needed and their interactions”.15 NQA’s gap guide flags the emphasis on “your processes and how they interact with the ISMS”.18 A process map is one way to show this; the standard does not prescribe the form.
The climate determination
Amendment 1:2024 adds one sentence at the end of 4.1, “The organization shall determine whether climate change is a relevant issue”, and a note at the end of 4.2, “Relevant interested parties can have requirements related to climate change”.19 ISO’s record gives 23 February 2024 as its publication date.3 IAF and ISO had published a joint communiqué on the climate amendments to management system standards on 22 February 2024, which IAF posted on its site on 23 February.2021
The communiqué says “the overall intent of the requirements for clauses 4.1 and 4.2 remain unchanged”. IAF’s accompanying decision treats the change as “a clarification rather than a new requirement” and on that basis concluded that “a full transition programme is not needed”.21 Certified organizations should determine climate change as relevant or not and, where relevant, consider it in their evaluation of risk. Certification bodies are expected to ensure it has been considered and, if relevant, included in any objectives and mitigation activities “by the organization, as required”; where the organization concluded it is not relevant, the certification body “is expected to ensure the effectiveness of the organization’s process to make this determination”. The decision says certification bodies should include the new text in their auditing “upon publication”, and that where an organization cannot demonstrate that the issues determined as relevant, including climate change, have been considered, “a suitable finding should be raised”; certificates did not need reissuing.21 The decision names factors such as “geographical location, nature of its supply-chain or workforce dynamics”.21
There is a tension here. The amendment is an express “shall”: since February 2024 the determination is a requirement, and an organization that has not made it does not conform. IAF’s “clarification” label governs the certification process: no full transition programme and no reissued certificates, with the new text audited from publication. So “it was only a clarification” cannot excuse a missing determination. A determination that climate change is not relevant is permitted, but the certification body still evaluates whether the process behind it was effective; no particular form of record is prescribed.
For an ISMS the plausible paths run mainly through availability (heat, flood or storm at facilities and data centres, supplier concentration, staff unable to reach sites) and through interested parties asking for climate-related assurances. An invented, illustrative negative determination follows; a register entry, a named record and a review cadence are possible evidence, not requirements.
Example B, determined not relevant. A ten-person advisory firm with no premises in scope works from home on a large cloud suite. Its record: “Considered 14 March 2026 by the ISMS manager and a director. Inputs: the provider’s independent assurance report describing geographically separated data centres; staff in different towns with laptops and mobile connectivity, so a local weather event affects one or two people who can work elsewhere; client contracts reviewed, no climate requirements. Plausible effects (local outages, travel disruption, provider site events) would not materially affect the ISMS’s ability to protect client information. Not a relevant issue. Re-evaluate at each management review or if a client raises climate requirements.” The auditor tests who decided, on what inputs, whether the reasoning addresses the plausible effects, and whether re-evaluation happens. The record argues relevance directly instead of pointing at an existing supplier risk entry, because relevance and treatment are different questions.
4.3: scope
Clause 4.3 requires the organization to determine the boundaries and applicability of the ISMS to establish its scope, considering the issues of 4.1, the requirements of 4.2, and “interfaces and dependencies between activities performed by the organization, and those that are performed by other organizations”; the scope must be available as documented information.15 NQA’s guidance lists what documented scopes typically describe: the physical sites and logical networks included or excluded, the internal and external employee groups, the processes, activities and services, and “key interfaces at the boundaries of the scope”.17
Under ISO/IEC 27006-1:2024 (9.1.3.6 in the Hong Kong Accreditation Service checklist built on it), the certification body confirms that clients address 27001 Clause 4.3, that the risk assessment and treatment “extends to the boundaries of its activities as defined in the scope of certification”, that a Statement of Applicability exists for that scope, and that interfaces with services or activities “not completely within the scope” are addressed and included in the risk assessment, such as shared IT systems or an outsourced business function.22 Separately, the people who review audit reports and make certification decisions must have the knowledge to verify the scope, “in particular the continuing validity of the identification of interfaces and dependencies and the associated risks” (7.1.3.3.1).22
Three illustrative ways these requirements go unmet:
- The unconsidered dependency. The platform’s identity provider or a managed service provider administering production lies outside the boundary, which is allowed, but the scoping and risk assessment never consider the interface, contrary to 4.3 c) and the certification body’s interface check.
- The ignored requirement. A customer contract requires the hosted service to be within the ISMS, the organization’s 4.2 analysis never records it, and the scope is set without considering it (4.3 b).
- The scope that does not match the SoA. The certification body cannot confirm an SoA exists for the scope of certification.
A separate concern is coverage: a correctly determined scope such as “corporate IT at head office” can still be narrower than a buyer needs. That is a question for the buyer, discussed in the family guide, not a nonconformity.
Clause 5: leadership
Clause 5.1 requires top management to demonstrate leadership and commitment by, among other things, ensuring the policy and objectives are established and compatible with strategic direction, integrating ISMS requirements into the organization’s processes, ensuring the needed resources are available, communicating the importance of effective information security management, ensuring the ISMS achieves its intended outcomes, directing and supporting people, and promoting continual improvement.15 NQA’s guidance describes how certification auditors approach it: they “typically test leadership by interview”, assessing top management’s involvement in evaluating risks and opportunities, setting policies and objectives, reviewing system performance, and allocating resources and responsibilities.17 ISO/IEC 27006-1 puts “top management leadership and commitment to the information security objectives” first on the list of what a stage 2 audit focuses on (9.3.1.2.2).22
Clause 5.2 requires a policy that is “appropriate to the purpose of the organization”, includes information security objectives or provides the framework for setting them, and commits to satisfying applicable requirements and to continual improvement; the policy must be available as documented information, communicated within the organization and available to interested parties as appropriate.15 Signatures, intranet postings and induction packs, which NQA suggests, are ways of evidencing approval and communication, not requirements in themselves.17
Clause 5.3 requires top management to ensure that responsibilities and authorities for roles relevant to information security are “assigned and communicated within the organization”, and to assign responsibility and authority for ensuring that the ISMS conforms to the standard and for reporting on its performance to top management.15
An illustrative weak pattern: the ISMS manager writes the policy, sets the objectives and chairs the review alone, top management signs, and an interview shows leadership cannot say what the objectives are, which puts 5.1 in question. Under ISO/IEC 27006-1 a certification body grants certification only when there is sufficient evidence that management reviews and internal ISMS audits “have been implemented, are effective, and will be maintained” (9.5.2).22
Clause 6: planning
6.1.1: risks and opportunities to the ISMS
Clause 6.1.1, titled General, requires the organization, when planning the ISMS, to consider the issues of 4.1 and the requirements of 4.2 and determine the risks and opportunities that need to be addressed to ensure the ISMS can achieve its intended outcomes, prevent or reduce undesired effects, and achieve continual improvement. It must then plan actions to address them, how to integrate and implement those actions into its ISMS processes, and how to evaluate their effectiveness.15 An SC 27 journal article on the risk process explicitly sets 6.1.1 aside as covering “risks and opportunities to the ISMS”, distinct from the information security risk assessment of 6.1.2 and 6.1.3.23 Examples are a key role falling vacant or an acquisition doubling the scope. Recording them in the information security risk register is one option, if it also tracks opportunities, actions, their integration and the evaluation of effectiveness.
6.1.2: the information security risk assessment process
This is the centre of the risk workflow. Clause 6.1.2 requires the organization to define and apply a risk assessment process that establishes and maintains risk criteria, including risk acceptance criteria and criteria for performing assessments; ensures that repeated assessments “produce consistent, valid and comparable results”; identifies risks associated with loss of confidentiality, integrity and availability for information within the scope, and identifies risk owners; analyses risks by assessing potential consequences and “the realistic likelihood” of occurrence and determining levels of risk; and evaluates risks against the criteria and prioritizes them for treatment. Documented information about the process must be retained.15 An SC 27 journal article by a WG 1 expert summarizes the same elements.23 ISO/IEC 27006-1 tells certification auditors to ensure that the assessments “produce consistent, valid and comparable results if repeated”.22 NQA adds what auditors look at: a record of the risk assessment, “an assigned owner for each risk identified and the criteria you have used”.17
The standard prescribes no method, and the SC 27 journal says an auditor “should not promote or require a specific approach”. It lists what a documented process usually contains: likelihood and impact scales with rules for applying them, a risk appetite that can be applied directly (“A vague statement about ‘we have a low appetite for risk’ is not acceptable”), acceptance and prioritization rules, and update triggers.23
“Consistent, valid and comparable” is where many methods are weak. DNV, a certification body, analysed its 2018 audits of more than 1,700 organizations certified to the 2013 edition and found that 27% did not meet the risk assessment requirement. It reported two usual reasons: the approach did not ensure consistency and validity of results, “e.g. a lack of scales for assigning values to likelihood and consequences”, and not all relevant risks were identified because organizations “focus on IT risks and risks from external origins”.24
Repeatability and validity differ. A repeatability check, our suggestion, gives one scenario to two assessors who did not write the method; agreement within one band on a five-point scale is an illustrative tolerance. Disagreement can come from the scales, from different assumptions or from training. Agreement does not show validity, which is tested against evidence such as incident history, loss data and threat intelligence.
What ISO/IEC 27005:2022 adds
ISO/IEC 27005:2022 (opens in a new tab), 62 pages, adapts “the general principles of ISO 31000 to the specific context of information security”.25 Its foreword lists alignment with 27001:2022 and ISO 31000:2018, a structure following 27001:2022, “risk scenario concepts”, the contrast of “the event-based approach” with “the asset-based approach to risk identification”, and a single annex of risk assessment techniques.26
The detailed 27005 text on the two approaches is not in the public preview, so what follows is explanation, not 27005’s own wording. The SC 27 journal names the commonly used approaches “Asset-vulnerability-threat and event-consequence”.23 An asset-based approach enumerates information and supporting assets, then the threats and vulnerabilities relevant to each; NQA’s guidance describes this method, taking assets one at a time and checking each for common threats and vulnerabilities, and notes that the Annex A asset inventory control (5.9) can supply the population.17 An event-based approach starts from scenarios such as a ransomware outage and works through sources and consequences. Combining them (scenarios for business-wide risks, assets where detail is needed) is our suggestion.
27005’s contents list the treatment steps in the same logical order as 27001: selecting treatment options, determining all necessary controls, comparing them with 27001 Annex A, producing a Statement of Applicability, formulating the risk treatment plan, “Approval by risk owners” and “Acceptance of the residual information security risks”.26 The order reflects dependencies (an SoA cannot be complete before the controls are determined), not a mandated project sequence, and the steps can be iterated.
6.1.3: treatment, the Annex A comparison and the Statement of Applicability
Clause 6.1.3 requires a risk treatment process that selects treatment options taking account of the assessment results; determines all controls necessary to implement them; compares those controls with Annex A and verifies “that no necessary controls have been omitted”; produces an SoA; formulates a risk treatment plan; and obtains “risk owners’ approval of the information security risk treatment plan and acceptance of the residual information security risks”. Documented information about the process must be retained.15 IAF’s transition document identifies the two Annex A touchpoints, the comparison in 6.1.3 c) and the SoA in 6.1.3 d).7
The comparison is a check on the risk process, run after the controls have been determined. SC 27’s auditing practices note on Annex A lists two improper uses: treating Annex A as a comprehensive list, and treating it as a requirement list, because “the shalls in Annex A apply only if the organization determines that the specific control is relevant”.27 Its companion note on the SoA says necessity is decided by the organization, “via (for example) risk assessment, or via the need to comply with contractual or legal obligations”, and that controls can come from other sources such as ISO/IEC 27011, 27017 or NIST.5 Neither note is endorsed by ISO or SC 27.275
What the SoA must contain. Under 6.1.3 d) the SoA contains the necessary controls, the justification for their inclusion, whether they are implemented or not, and the justification for excluding any Annex A controls.155 IAF notes that the 2022 edition reorganized the wording of 6.1.3 d) “to remove potential ambiguity”.7
How it can be laid out. NQA’s implementation guide recommends that every Annex A control appear, says “Simply listing selected controls will not meet the requirement”, and suggests a table with columns for control, applicable, implemented and justification.17 The SC 27 SoA note is more permissive: the standard “specifies what the SOA must contain. It does not specify how it should be structured.” An organization can use the Annex A structure, or list its necessary controls first and the justifications for unnecessary Annex A controls after, grouping Annex A controls that share a justification; necessary controls need not use Annex A names or wording, but the mapping to Annex A must be demonstrable for 6.1.3 c).5 Auditors may prefer NQA’s Annex A-shaped layout because it makes the 6.1.3 c) comparison visible line by line. Another layout is defensible if the organization can demonstrate the Annex A comparison and justify exclusions. An explicit mapping is one way to show the comparison. The SoA note also states that a necessary control performed by an external organization “must still be included in the SOA”.5
The plan and residual risk. The clause requires risk owners to approve the treatment plan and accept residual risks.15 NQA goes further as a certification body: it expects a plan “sufficiently detailed to enable the implementation status of each action to be verified”, with evidence of approval “by the assigned risk owners and Top Management”.17 Top management approval is NQA’s expectation, not a 6.1.3 requirement. DNV gave, as qualitative examples from its audits, a risk treatment plan that “does not include deadlines and responsibilities for the actions” and exclusions of Annex A controls that “are not correctly justified”, including controls declared not applicable that had in fact been implemented.24
Worked example: from a risk register line to an SoA line
The example is illustrative and invented for this article. Annex A control numbers and titles are as given in a certification body summary (5.23 Information security for use of cloud services, 7.4 Physical security monitoring, 8.9 Configuration management, 8.12 Data leakage prevention, 8.16 Monitoring activities).18
Risk register entry R-014
| Field | Entry |
|---|---|
| Scenario (event-based) | Unauthorized access to customer files through a misconfigured cloud storage bucket in production |
| Information and property | Customer document store; confidentiality |
| Risk owner | Head of Platform Engineering |
| Controls assumed in the current score | Operating today: infrastructure as code, peer review of changes, policy-as-code guardrails blocking public buckets (C-01), cloud service security requirements (5.23), and configuration baselines in some production accounts (8.9) |
| Current assessment (with those controls) | Likelihood 3 of 5 (“expected once in 2 to 5 years” on the method’s anchored scale); consequence 4 of 5 (“notifiable breach affecting more than 1,000 records or a contractual penalty”); level 12, above the acceptance threshold of 8 |
| Treatment option | Modify: reduce likelihood. Consequence is unchanged, because a breach of this store would still be notifiable |
| Controls determined | The operating controls above, plus continuous scanning and automatic removal of public access (C-02) and extension of configuration baselines (8.9) to all remaining production accounts. Scanning and remediation shorten the window for unauthorized access. Enforced baselines prevent public access in the remaining accounts. The consequence is unchanged |
| Target residual (forecast) | Likelihood 1, consequence 4: level 4, within appetite, once C-02 and 8.9 are complete and reassessed |
| Plan | RTP-2026-07: scanning and baselines due 31 January 2027; plan approved by risk owner on 3 November 2026 |
| Residual acceptance | Risk owner accepted the forecast residual of 4 on 3 November 2026, conditional on RTP-2026-07 completing; until then the current level of 12 stays on the register, flagged as above appetite |
| Review | Reassess when RTP-2026-07 closes (8.2); confirm actual residual |
Corresponding SoA lines
| Control | Necessary | Implemented | Justification and reference |
|---|---|---|---|
| 5.23 Information security for use of cloud services | Yes | Yes | Treats R-014, R-031; customer contract security schedule; Cloud Security Policy v2 |
| 7.4 Physical security monitoring | Yes | Yes, performed by the hosting provider | Treats R-040 (unauthorized physical access at provider sites); assurance from the provider’s independent attestation report covering physical security, reviewed annually under supplier controls; provider dependency assessed in R-040 |
| 8.9 Configuration management | Yes | Not yet fully: baselines applied to some production accounts; remaining production accounts due 31 January 2027 under RTP-2026-07 | Treats R-014, R-022; Configuration Standard v3 |
| 8.12 Data leakage prevention | Yes | Yes | Treats R-019 (bulk exfiltration of customer files by a compromised account): DLP alerting on bulk downloads; DLP runbook |
| C-01 Policy-as-code guardrails (custom; maps to 8.9) | Yes | Yes | Treats R-014 |
| C-02 Continuous cloud configuration scanning and automatic removal of public access (custom; maps to 8.9 and 8.16) | Yes | Not yet implemented; due 31 January 2027 under RTP-2026-07 | Treats R-014 |
The example shows what an auditor traces: controls justified by risks or contract; the controls behind each score named; not-yet-implemented controls tied to a dated, approved plan; conditional acceptance of a forecast residual kept separate from the current level; custom controls mapped to Annex A; and a supplier-performed control still in the SoA with its source of assurance, as the SC 27 note advises.5 Controls need not trace to exactly one risk; some are necessary because of law or contract alone.
6.2: objectives
Clause 6.2 requires information security objectives “at relevant functions and levels”. They must be consistent with the policy, “measurable (if practicable)”, take into account applicable information security requirements and risk assessment and treatment results, and (items d to g) be monitored, communicated, updated as appropriate and available as documented information; the organization retains documented information on them, and plans must say what will be done, with what resources, who is responsible, when it will be completed and how results will be evaluated.15 The monitoring item is the 2022 addition; IAF lists 6.2 d) among the alignments with the harmonized structure.718
An SC 27 journal article explains the two qualifiers. “Measurable if practicable” acknowledges that some objectives cannot be measured directly, though “seemingly unmeasurable objectives such as the preservation of confidentiality can be converted into a series of measurable ones”; and measurable does not mean numeric: “Qualitative results (e.g., ‘yes/no’ answers) can also be considered, when supported by appropriate evidence.” Monitoring, the article adds, means monitoring fulfilment of the objectives, which links 6.2 to 9.1.23
Illustrative failures: “improve security awareness” with no way to evaluate fulfilment, or results nobody reviews.
6.3: planning of changes
The contents list in the publisher’s preview runs from 6.2 straight to Clause 7, so a matrix built from it can miss this subclause, which 27701:2025 and 42001:2023 list as “6.3 Planning of changes”; the 2022 text itself, in a publisher’s redline preview, contains it.6131415 IAF records it as new: it “defines that the changes to the ISMS shall be carried out by the organization in a planned manner”.7 It concerns changes to the management system itself (a scope extension, a merger, a new risk method); operational change control sits in 8.1 and Annex A. NQA advised transitioning clients to “be prepared to demonstrate how you plan any changes to the ISMS”; an ISMS change record stating purpose, consequences, resources and responsibilities is one way, our suggestion.18
Annex A in one paragraph
Annex A lists 93 controls, taken from ISO/IEC 27002:2022 as titles and control statements, in four themes: organizational, people, physical and technological.718 The implementation guidance, purpose statements and attributes are in 27002, which ISO says “cannot be certified to”.2 For the role of 27002, its attributes and the 2022 control changes, see the family guide. Structurally, Annex A enters 27001 through 6.1.3 and the SoA, and an Annex A control that the organization determines is unnecessary can be excluded with justification.275
Clause 7: support
Resources, competence, awareness and communication
Clause 7.1 covers the resources needed for the ISMS, which NQA reads as people, infrastructure and environment as well as tools and materials.17 Clause 7.2 requires the organization to determine the necessary competence of persons doing work under its control that affects information security performance; ensure they are competent on the basis of education, training or experience; “where applicable, take actions to acquire the necessary competence, and evaluate the effectiveness of the actions taken”; and retain documented information as evidence of competence.15 NQA says an auditor “will expect you to have documents detailing your knowledge and skills requirements”, backed by records such as training certificates, attendance records or internal competency assessments.17
Clause 7.3 requires persons doing work under the organization’s control to be aware of the information security policy, their contribution to the effectiveness of the ISMS “including the benefits of improved information security performance”, and the implications of not conforming.15 In our reading, persons doing work under the organization’s control can include contractors and supplier staff working under its direction; NQA’s guidance applies awareness to staff, suppliers and contractors.17 Clause 7.4 requires the organization to determine the need for internal and external communications relevant to the ISMS, including what, when, with whom and how to communicate.1528 A defined communication process is one way to meet it.
Documented information and the mandatory set
Clause 7.5 has three parts: 7.5.1 General, 7.5.2 Creating and updating, and 7.5.3 Control of documented information.6 Under 7.5.1 the ISMS includes documented information required by the standard and “documented information determined by the organisation as being necessary for the effectiveness” of the ISMS.28 DQS, a certification body, calls the second part the source of complexity, because each organization decides its own documentation needs, and summarizes 7.5.2 as identification, appropriate format and review and approval.29 Clause 7.5.3 requires documented information to be available and suitable for use where and when needed and adequately protected, and the organization to address, as applicable, distribution, access, retrieval and use; storage and preservation; control of changes; and retention and disposition.28 Clause 7.5.3 also requires the organization to identify as appropriate and control externally sourced documented information it deems necessary for planning and operating its ISMS.4 NQA gives review before release as a practical example.17
The standard contains no single list of mandatory documents; the requirements are spread through Clauses 4 to 10. The table compiles them from IAF MD 26, which lists the clauses where “Documented information shall be available as evidence” (9.1, 9.2.2, 9.3.3 and 10.2), from consultancy pages reproducing the clauses, and from certification body guidance. It is our compilation; the standard’s text is the authority.
| Clause | Documented information | Source |
|---|---|---|
| 4.3 | ISMS scope | 1517 |
| 5.2 | Information security policy | 17 |
| 6.1.2 | Information about the risk assessment process (including criteria) | 15 |
| 6.1.3 | Information about the risk treatment process; Statement of Applicability | 155 |
| 6.2 | Information security objectives | 15 |
| 7.2 | Evidence of competence | 15 |
| 7.5.1 b) | Documented information the organization determines is necessary for effectiveness | 2829 |
| 8.1 | Documented information to the extent necessary to have confidence that processes were carried out as planned | 30 |
| 8.2 | Results of the risk assessments | 3132 |
| 8.3 | Results of risk treatment | 33 |
| 9.1 | Documented evidence of monitoring, measurement, analysis and evaluation results | 47 |
| 9.2.2 | Evidence of the audit programme’s implementation and the audit results | 716 |
| 9.3.3 | Evidence of the results of management reviews | 716 |
| 10.2 | Evidence of the nature of nonconformities, actions taken and results of corrective action | 7 |
The 6.1.2 row covers the process; the results of individual assessments are recorded under 8.2. Annex A adds documentation of its own when controls are selected, such as an inventory of information and associated assets under 5.9.17 At stage 1, ISO/IEC 27006-1 requires the certification body to obtain “documentation on the design of the ISMS covering the documentation required in ISO/IEC 27001” (9.3.2.1).22
Clause 8: operation
Clause 8.1 requires the organization to plan, implement and control the processes needed to meet requirements and to implement the actions determined in Clause 6, by establishing criteria for the processes and controlling the processes in accordance with those criteria; to keep documented information to the extent necessary for confidence that processes were carried out as planned; to control planned changes and review the consequences of unintended ones, “taking action to mitigate any adverse effects, as necessary”; and to ensure that externally provided processes, products or services relevant to the ISMS are controlled.30 The last phrase replaced “outsourced processes” in 2022.7 The test is relevance to the ISMS. The SC 27 SoA note illustrates this with power supply. Where loss of supply does not affect the ISMS’s intended results, the supply falls outside that relevance test. If treating the risk requires a supporting-utilities control, the organization includes it in the SoA even when an external party performs it.5 A risk can be acceptable precisely because supplier controls and contractual obligations are working, so acceptability does not by itself take a service outside 8.1.
Under 8.2 the organization takes account of the criteria established under 6.1.2 a) when assessing risk. It assesses risk at planned intervals and when significant changes are proposed or occur.4 Advisera, a consultancy, describes audit evidence in those terms.31 DQS advises scheduling assessments “on a regular basis and ad hoc too if needed” and documenting the findings.33 NQA suggests at least annual review and reassessment when treatment actions complete, when assets or processes change, or when new risks appear.17 An auditor can test both bases: was the planned interval kept, and did a proposed acquisition, a cloud migration or a major incident lead to a reassessment?
Clause 8.3 requires the risk treatment plan to be implemented and the results retained.33 NQA: the plan “cannot simply remain as a statement of intent”.17 For transition audits to the 2022 edition, certification bodies were instructed not to rely only on document review, “especially for reviewing the technological information security controls”.7
Clause 9: performance evaluation
9.1: monitoring, measurement, analysis and evaluation
Clause 9.1 requires the organization to determine what needs to be monitored and measured, including information security processes and controls; the methods, as applicable, to ensure valid results; when monitoring and measuring are performed and by whom; and when and by whom the results are analysed and evaluated. Documented information must be available as evidence of the results, and the organization evaluates information security performance and the effectiveness of the ISMS.47 Under ISO/IEC 27006-1, stage 2 audits focus on “information security performance and the effectiveness of the ISMS, evaluating these against the information security objectives”.22
The measurement guidance, ISO/IEC 27004:2016 (opens in a new tab), was written for “ISO/IEC 27001:2013, 9.1”; it is marked for revision, and ISO/IEC DIS 27004 has closed its draft ballot (stage 40.60).34
9.2: internal audit
The 2022 edition split internal audit into 9.2.1 General and 9.2.2 Internal audit programme.67 Under 9.2.1 the organization conducts internal audits at planned intervals to provide information on whether the ISMS conforms to “the organisation’s own requirements for its information security management system” and to the requirements of the standard, and whether it is effectively implemented and maintained. Under 9.2.2 it plans and maintains an audit programme, including frequency, methods, responsibilities, planning requirements and reporting, considering “the importance of the processes concerned and the results of previous audits”; defines criteria and scope for each audit; selects auditors and conducts audits that “ensure objectivity and the impartiality of the audit process”; reports results to relevant management; and keeps documented information as evidence of the programme’s implementation and the results.16 BSI’s self-assessment checklist asks the same in plain terms: internal audits “using impartial auditors”, with results reported to management and documented.32
NQA describes what it expects as a certification body: a plan under which all ISMS processes are audited “over a three-year cycle”, with higher frequency for processes that show poor performance or manage the most significant risks.17 The standard sets no cycle. A three-year internal programme mirrors the certification cycle; for multi-site clients audited using a sample-based approach, for example, the certification body’s programme covers representative samples of the certified scope “within the three-year period” (27006-1, 9.1.5 in the HKAS checklist).22 When setting a different cadence, consider process importance and previous audit results as Clause 9.2.2 requires. Risk can also inform that decision. The programme should show how audits cover the ISMS over the period chosen.417
9.3: management review
Management review is in three parts: 9.3.1 General, 9.3.2 Management review inputs and 9.3.3 Management review results.67 Top management reviews the ISMS at planned intervals to ensure its continuing suitability, adequacy and effectiveness. As reproduced on a consultancy page, the 9.3.2 inputs are: the status of actions from previous reviews; changes in external and internal issues relevant to the ISMS; changes in the needs and expectations of interested parties relevant to the ISMS; feedback on information security performance, including trends in nonconformities and corrective actions, monitoring and measurement results, audit results and fulfilment of objectives; feedback from interested parties; results of risk assessment and status of the risk treatment plan; and opportunities for continual improvement. Under 9.3.3 the results include “decisions related to continual improvement opportunities and any needs for changes” to the ISMS, with documented information as evidence.16 The interested-parties item, 9.3.2 c), is the substantive 2022 addition, as NQA’s gap guide notes.18
NQA notes that the inputs can be spread across existing meetings if a table shows which meeting covers which. The records need not be extensive but must “contain a record of any decisions made and actions agreed”.17 A climate determination such as Example B’s can be re-evaluated here, as can changes planned under 6.3.
Clause 10: improvement
The 2022 edition swapped the order of the two subclauses: 10.1 is now Continual improvement and 10.2 Nonconformity and corrective action.67 IAF attributes the swap to alignment with the harmonized structure, and the 10.2 evidence wording was aligned at the same time: documented information “shall be available as evidence”.7
Under 10.2, when a nonconformity occurs, the organization must react. Where applicable, it must control and correct the nonconformity and deal with the consequences.4 Second, it evaluates the need for action to eliminate the causes, by reviewing the nonconformity, determining its causes and determining whether similar nonconformities exist or could occur; it then implements any action needed, reviews the effectiveness of corrective action taken, and changes the ISMS if necessary. A correction (the missed access review is done) answers the first stage; the second asks why it was missed and whether the gap exists elsewhere. The standard prescribes no root-cause technique; NQA mentions “Five Whys” as one simple option.17 Clause 10.1 requires continual improvement of the ISMS’s suitability, adequacy and effectiveness.35 Evidence can come from management review decisions, corrective actions and ISMS changes; the absence of a particular improvement in one audit cycle does not by itself show a failure, but, for example, review findings that the ISMS no longer suits a changed business with no resulting action would.
How a certification audit tests the clauses
ISO/IEC 27006-1:2024, the requirements for ISMS certification bodies, shapes what an implementer will be asked for. The Hong Kong Accreditation Service checklist makes its requirements visible, with clause numbers.22
- Stage 1 (9.3.2.1) obtains the documentation required by 27001 and enough understanding of the ISMS design, the risk assessment and treatment (including the controls determined), the policy and objectives, and the client’s readiness, to plan stage 2.
- Stage 2 (9.3.2.2, focus in 9.3.1.2.2) evaluates effective implementation and confirms that the client adheres to its own policies, objectives and procedures. It focuses on leadership commitment; risk assessments that give consistent, valid and comparable results if repeated; the determination of controls from risk assessment and treatment; performance and effectiveness against objectives; “correspondence between the determined controls, the Statement of Applicability and the results of the information security risk assessment, the risk treatment process and the information security policy and objectives”; implementation of controls, to determine whether controls declared as implemented “are actually implemented and effective as a whole”; and programmes, records, internal audits and reviews traceable to top management decisions.
- Audit report (9.4.3.1) provides, or refers to, an account of the audit of the client’s information security risk analysis, and identifies any other control sets used for comparison under 6.1.3 c).
- Certification decision (9.5.2) is not made until management reviews and internal audits are shown to be implemented, effective and maintained.
- Surveillance. The programme as a whole (9.6.2.2) covers risk assessment, internal audit, management review and corrective action; every surveillance audit (9.6.2.3) reviews, among other things, control and SoA changes and control effectiveness.
Where implementations go wrong
One certification body’s audit data
DNV published an analysis of 2018 audit findings for more than 1,700 organizations certified to ISO/IEC 27001:2013, so Annex A references use the old numbering. 78% of companies had at least one finding of any kind, and 40% ended the audit with at least one major or minor nonconformity.24 DNV set aside 9.2 and 9.3 as “common to all management systems, and hence less relevant here”, and analysed 6.1.2 risk assessment, 6.1.3 risk treatment, the review of user access rights and the asset inventory in detail. For risk assessment it reported a 27% failure rate, with the two causes described above: inconsistent approaches, such as missing scales, and a focus on IT and external-origin risks. For risk treatment it gave qualitative examples, a plan without deadlines and responsibilities and exclusions not correctly justified, without a separate incidence figure.24 These are historical observations from one certification body’s sample against the previous edition; they say nothing about current incidence across certification bodies.
What the guidance offers, and when
ISO/IEC 27003:2017 (opens in a new tab), the clause-by-clause guidance, still “provides explanation and guidance on ISO/IEC 27001:2013” and is marked to be revised (stage 90.92).36 Its successor, ISO/IEC DIS 27003, Guidance for the application of ISO/IEC 27001:2022, is registered as a draft International Standard (stage 40.00), “in the enquiry phase with ISO members”, with 50 pages listed; SC 27’s catalogue shows the same stage.3637 Until then the 2017 text remains useful where requirements did not change, cross-checked against the 2022 text; it cannot cover 4.2 c), the 6.2 monitoring item, 6.3, the 8.1 wording, 9.3.2 c), the climate amendment or the 2022 Annex A. ISO/IEC 27005:2022 is current and aligned with the 2022 edition.26
What 2013 to 2022 changed at clause level
The family guide lists the changes; the examples here are ours. Changes are from IAF MD 26, whose list is expressly non-exhaustive (“include, but are not limited to”), and NQA’s gap guide.718
| Change | Example of practical consequence |
|---|---|
| 4.2 c): determine which interested-party requirements the ISMS addresses | For example, a register column recording whether and how each requirement is addressed |
| 6.1.3 d): SoA wording reorganized; Annex A replaced | SoA remapped to the 93 controls and exclusion justifications revisited |
| 6.2 d): objectives monitored | Each objective has a way of evaluating fulfilment and a review point |
| 6.3: planning of changes (new) | For example, a change record for ISMS-level changes; easy to miss because the preview’s contents list omits it |
| 8.1: externally provided processes, products or services | Cloud and SaaS dependencies relevant to the ISMS treated as controlled external provision |
| 9.2 and 9.3 split into subclauses | Renumbering and restructuring; no new obligation of substance |
| 9.3.2 c): changes in interested parties’ needs and expectations as a review input | A substantive new input; links to 4.2 and the climate note |
IAF judged that the impact of the 2022 edition on organizations with an existing ISMS “need not be significant”, and set minimum transition audit times of 0.5 auditor-days with a recertification and 1.0 when combined with a surveillance audit or done separately.7 Its historical explanation cites the 2022 edition of the ISO/IEC Directives, Part 1, which allows no more than two separate amendments to a standard; the 2022 text was prepared by integrating the 2013 edition, its two corrigenda and a draft amendment updating Annex A; Corrigendum 1 overlapped with the draft amendment, and the 6.1.3 d) rewording came from Corrigendum 2.7 INAB, the Irish accreditation body, gave the same general rationale and said it intended “to follow exactly” the IAF arrangements.38 The 2024 climate amendment is a separate, later change, covered under Clause 4 above.
Practitioner checklist by clause
The table is our synthesis of the requirements described above and of certification body expectations. The last column gives possible nonconformities, with the requirement each would leave unmet; it is a working aid, not a substitute for the standard’s text.
| Clause | What must exist | Evidence an auditor may sample | Possible nonconformity (requirement unmet) |
|---|---|---|---|
| 4.1 | Determined internal and external issues, including the climate determination | Context record; who decided and when | No climate determination made (4.1 as amended); a missing written rationale is an evidence gap the auditor will probe, not a requirement in itself |
| 4.2 | Interested parties, their relevant requirements, and which are addressed through the ISMS | Register of contract, legal and customer requirements | No decision on which requirements the ISMS addresses (4.2 c) |
| 4.3 | Documented scope considering issues, requirements, interfaces and dependencies | Scope statement; diagrams; supplier list | Interfaces and dependencies not considered (4.3 c) |
| 4.4 | ISMS including needed processes and their interactions | Process descriptions; owners | Needed processes not established (4.4) |
| 5.1 | Top management leadership and commitment | Interview; review minutes; resource decisions | Leadership not demonstrated (5.1) |
| 5.2 | Policy appropriate to purpose, with objectives or framework and the required commitments, communicated and available | Policy; approval record; communication evidence | Policy missing a required commitment, or not communicated (5.2) |
| 5.3 | Roles assigned and communicated; responsibility for conformity and for reporting performance | Role descriptions; communication record | No one assigned to report ISMS performance to top management (5.3 b) |
| 6.1.1 | Risks and opportunities to the ISMS, planned actions, integration and effectiveness evaluation | Register or plan with actions and evaluation | No plan for evaluating the actions’ effectiveness (6.1.1 e) 2)) |
| 6.1.2 | Risk process with acceptance and performing criteria, risk owners, consistent, valid and comparable results | Method; register; a re-run of one scenario | Scales or rules too vague for consistent results (6.1.2 b) |
| 6.1.3 | Treatment, Annex A comparison, SoA, plan, risk owner approval and residual acceptance | SoA lines traced to risks or requirements; approvals | Annex A exclusion without justification (6.1.3 d) |
| 6.2 | Objectives at relevant functions and levels, measurable if practicable, monitored, with plans | Objectives and evidence of fulfilment | Objectives not monitored (6.2 d) |
| 6.3 | ISMS changes carried out in a planned manner | ISMS change records | Scope or method changed without planning (6.3) |
| 7.1 to 7.4 | Resources; competence of persons under the organization’s control, with actions and effectiveness evaluation where applicable; awareness, including the benefits of improved performance; what, when, with whom and how to communicate | Competence records; interviews | Training given but its effectiveness not evaluated (7.2 c) |
| 7.5 | Required and organization-determined documented information, created and controlled | Version history; approvals; access controls | Uncontrolled or obsolete documents in use (7.5.3) |
| 8.1 | Process criteria and control, planned change control, control of relevant external provision | Records that processes ran as planned; supplier oversight | Relevant external service not controlled (8.1) |
| 8.2 | Risk assessments at planned intervals and when significant changes are proposed or occur | Dated assessments; change triggers | Proposed major change not assessed (8.2) |
| 8.3 | Treatment plan implemented, results retained | Plan status; evidence of control operation | Treatment plan left unimplemented (8.3) |
| 9.1 | What to monitor and measure, applicable methods that ensure valid results, when and who monitors and measures, when and who analyses and evaluates results, and evaluation of performance and effectiveness | Measurement plan; results and evaluations | Results collected but no one assigned to analyse and evaluate them (9.1) |
| 9.2 | Programme based on process importance and previous results; objective, impartial audits; results reported | Programme; reports; auditor selection | Auditor selection that does not ensure objectivity and impartiality, for example auditors reviewing their own work (9.2.2 b) |
| 9.3 | Reviews covering all 9.3.2 inputs; decisions on improvement and changes | Minutes mapped to inputs | Interested-party changes not considered (9.3.2 c) |
| 10.1 | Continual improvement of suitability, adequacy and effectiveness | Review decisions; corrective actions; ISMS changes | Known unsuitability or ineffectiveness left without action (10.1) |
| 10.2 | Reaction, cause evaluation, check for similar nonconformities, action, effectiveness review, ISMS changes if necessary | Corrective action records | Effectiveness of corrective action not reviewed (10.2) |
For organizations that must also meet a contractual control baseline, the same machinery applies. Under 32 CFR 170.14(c)(3), the security requirements of CMMC Level 2 “are identical to the requirements in NIST SP 800–171 R2”.39 An organization in scope treats that baseline as an interested-party requirement under 4.2, maps the applicable NIST SP 800-171 Rev. 2 requirements to the controls it determines under 6.1.3 b), and records its necessary controls in the SoA; the SC 27 SoA note confirms that controls can be necessary because of contractual or legal obligations.5 The baseline’s requirements and the organization’s implementing controls play different roles, and a 27001 certificate does not by itself demonstrate compliance with CMMC under 32 CFR Part 170.
Conclusion
ISO/IEC 27001:2022 is short partly because it shares its clause structure and much core text with other ISO management system standards. Its main ISMS-specific workflow sits in four subclauses, 6.1.2, 6.1.3, 8.2 and 8.3, with Annex A as a reference set to catch omissions, and information security provisions also run through the shared clauses, from the objectives in 6.2 to the risk inputs of the management review. Implementations take time because the risk workflow demands a method whose results are consistent, valid and comparable when repeated, named owners who approve treatment and accept residual risk, and a Statement of Applicability that records every necessary control and justifies every Annex A exclusion, with assessments performed at planned intervals and when significant changes are proposed or occur (8.2), and the treatment plan implemented with results retained (8.3). One certification body’s 2018 audit sample showed weaknesses in the risk assessment and treatment subclauses. The 2022 edition added an explicit decision on which interested-party requirements the ISMS addresses, planned changes to the ISMS, monitored objectives and a new management review input. The 2024 amendment adds a climate determination; IAF treats it as a clarification for certification purposes, but the determination itself is a requirement. For the family context and what a certificate proves to a buyer, read the ISO/IEC 27000 family guide.
Footnotes
- ISO/IEC 27001:2022, Information security management systems, Requirements, catalogue entry with FAQ (19 pages, CHF 155), ISO, accessed 27 November 2026. https://committee.iso.org/standard/27001 (opens in a new tab) ↩
- ISO/IEC 27002:2022, Information security controls, catalogue entry with FAQ (152 pages), ISO, accessed 27 November 2026. https://committee.iso.org/standard/75652.html (opens in a new tab) ↩1 ↩2
- ISO/IEC 27001:2022/Amd 1:2024, Climate action changes, catalogue entry (1 page, published 23 February 2024), ISO, accessed 27 November 2026. https://committee.iso.org/standard/88435.html (opens in a new tab) ↩1 ↩2
- ISO/IEC 27001:2022, Information security, cybersecurity and privacy protection: Information security management systems: Requirements, third edition, ISO and IEC, October 2022 (paid standard; catalogue entry). https://www.iso.org/standard/82875.html (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7
- ISO/IEC 27001 Auditing Practices Group, “Auditing Practices Note: Statement of Applicability (SoA)”, ISO/IEC JTC 1/SC 27/WG 1 N 3298, 11 September 2022 (not endorsed by ISO or SC 27, per its disclaimer). https://committee.iso.org/files/live/sites/jtc1sc27/files/resources/ISO-IECJTC1-SC27-WG1_N3298_Auditing%20Practices%20Note%20-%20SoA.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11
- ISO/IEC 27001:2022, preview of foreword, introduction, Clauses 1 to 3, contents and bibliography, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27001-2022-en.html (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9
- IAF MD 26:2023, Transition Requirements for ISO/IEC 27001:2022, Issue 2, International Accreditation Forum, issued 15 February 2023. https://iaf.nu/iaf_system/uploads/documents/IAF_MD26_Issue_2_15012023.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16 ↩17 ↩18 ↩19 ↩20 ↩21 ↩22
- The JTCG (Joint Technical Coordination Group on Management System Standards), home page, ISO/IEC JTCG, updated 30 June 2026. https://committee.iso.org/home/jtcg (opens in a new tab) ↩
- “Exploring MSS”, harmonized approach and harmonized structure, ISO/IEC JTCG, accessed 27 November 2026. https://committee.iso.org/sites/jtcg/home/exploring-mss.html (opens in a new tab) ↩1 ↩2 ↩3
- “Management system standards”, including “ISO management standards and the concept of a harmonized structure” and “Annex SL: more than a shared structure”, ISO, accessed 27 November 2026. https://committee.iso.org/management-system-standards.html (opens in a new tab) ↩
- International Accreditation Forum, legacy home page (“IAF ceased operations on 01 January 2026”), IAF, accessed 27 November 2026. https://iaf.nu/en/home/ (opens in a new tab) ↩
- Frequently asked questions, Global Accreditation Cooperation Incorporated, accessed 27 November 2026. https://global-aci.org/en/faq/ (opens in a new tab) ↩
- ISO/IEC 27701:2025, Privacy information management systems, preview of contents and opening clauses, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27701-2025-en.html (opens in a new tab) ↩1 ↩2
- ISO/IEC 42001:2023, Artificial intelligence management system, preview of contents and introduction, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-42001-2023-en.html (opens in a new tab) ↩1 ↩2 ↩3
- ISO/IEC 27001:2022 redline preview against the 2013 edition (foreword, introduction and Clauses 1 to 7.4), published by the Slovenian Institute for Standardization (SIST), accessed 27 November 2026. https://preview.sist.si/sist-preview/82875/4d4c8d99950c4b39aaa39cf5cb9a0bf3/ISO-IEC-27001-2022.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16 ↩17 ↩18 ↩19 ↩20 ↩21
- ISO 27001 Clause 9.2 and 9.3 guides reproducing the clause wording, High Table (a consultancy), accessed 27 November 2026. https://hightable.io/iso-27001-clause-9-2-internal-audit/ (opens in a new tab); https://hightable.io/iso-27001-clause-9-3/ (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5
- ISO 27001:2022 Implementation Guide, NQA (a certification body), 2024. https://www.nqa.com/medialibraries/NQA/NQA-Media-Library/PDFs/NQA-ISO-27001-Implementation-Guide.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9 ↩10 ↩11 ↩12 ↩13 ↩14 ↩15 ↩16 ↩17 ↩18 ↩19 ↩20 ↩21 ↩22
- ISO 27001:2022 Gap Guide, NQA (a certification body), February 2023. https://www.nqa.com/medialibraries/NQA/NQA-Media-Library/PDFs/Final-27001-Gap-Guide.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8
- ISO/IEC 27001:2022/Amd 1:2024, Climate action changes, preview of the amendment text, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27001-2022-amd-1-2024-en.html (opens in a new tab) ↩
- “IAF and ISO Publish Joint Communiqué”, International Accreditation Forum, 23 February 2024. https://iaf.nu/en/news/iaf-and-iso-publish-joint-communique/ (opens in a new tab) ↩
- IAF-ISO Joint Communiqué on Addition of Climate Change Considerations to MSS, with the IAF final decision, International Accreditation Forum, February 2024. https://iaf.nu/wp-content/uploads/2024/02/IAF-ISO-Joint-Communique-_2024F.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4
- HKCAS 007 Annex II(F), Management System Checklist (for ISMS certification), based on ISO/IEC 27006-1:2024 and HKCAS SC-08, Hong Kong Accreditation Service, 1 April 2025. https://www.itc.gov.hk/en/quality/hkas/doc/hkcas/HKCAS007-A2F.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5 ↩6 ↩7 ↩8 ↩9
- SC 27 Journal, Volume 3, Issue 4, articles on auditing practice by WG 1 experts (including “How do I monitor, measure, analyse, and evaluate?” and Pablo Corona-Fraga, “Risk management process”), ISO/IEC JTC 1/SC 27 N 23202, October 2023 (views of the authors, not of ISO or SC 27). https://committee.iso.org/files/live/sites/jtc1sc27/files/resources/ISO-IEC%20JTC%201-SC%2027_N23202_SC27%20Journal%20Vol%203%20Issue%204.pdf (opens in a new tab) ↩1 ↩2 ↩3 ↩4 ↩5
- “Insights from auditing information security management systems”, DNV (a certification body), published 21 November 2019, analysing 2018 audit data. https://www.dnv.com/article/insights-from-auditing-information-security-management-systems-162216/ (opens in a new tab) ↩1 ↩2 ↩3 ↩4
- ISO/IEC 27005:2022, Guidance on managing information security risks, catalogue entry with FAQ (62 pages), ISO, accessed 27 November 2026. https://committee.iso.org/standard/80585.html (opens in a new tab) ↩
- ISO/IEC 27005:2022, Guidance on managing information security risks, preview of foreword, introduction, scope, terms and contents, published by the GCC Standardization Organization (GSO), accessed 27 November 2026. https://gso-sims-preview-doc-aws.s3-eu-west-1.amazonaws.com/iso-iec-27005-2022-en.html (opens in a new tab) ↩1 ↩2 ↩3
- ISO/IEC 27001 Auditing Practices Group, “Auditing Practices Note: What is Annex A?”, ISO/IEC JTC 1/SC 27/WG 1 N 3297, 11 September 2022 (not endorsed by ISO or SC 27, per its disclaimer). https://committee.iso.org/files/live/sites/jtc1sc27/files/resources/ISO-IECJTC1-SC27-WG1_N3297_Auditing%20Practices%20Note%20-%20Annex%20A.pdf (opens in a new tab) ↩1 ↩2 ↩3
- ISO 27001 Clause 7.4, 7.5.1 and 7.5.3 guides reproducing the clause wording, High Table (a consultancy), accessed 27 November 2026. https://hightable.io/iso-27001-clause-7-4-communication-essential-guide/ (opens in a new tab); https://hightable.io/iso-27001-clause-7-5-1-documented-information/ (opens in a new tab); https://hightable.io/iso-27001-clause-7-5-3-control-of-documented-information-essential-guide/ (opens in a new tab) ↩1 ↩2 ↩3 ↩4
- Brad Fabiny, “Understanding Clause 7.5: Documented Information”, DQS (a certification body), 12 April 2024. https://www.dqsglobal.com/en/explore/blog/understanding-clause-7.5-documented-information (opens in a new tab) ↩1 ↩2
- ISO 27001 Clause 8.1 guide reproducing the clause wording, High Table (a consultancy), accessed 27 November 2026. https://hightable.io/iso-27001-clause-8-1-operational-planning-and-control-essential-guide/ (opens in a new tab) ↩1 ↩2
- “ISO 27001 clause 8.2 Information security risk assessment”, Advisera (a consultancy), accessed 27 November 2026. https://advisera.com/iso27001/clause-8-2-information-security-risk-assessment/ (opens in a new tab) ↩1 ↩2
- Information Security Management System ISO/IEC 27001 Self-assessment checklist, BSI (a certification body), 2025. https://fcms.bsigroup.com/siteassets/pdf/en/insights-and-media/insights/brochures/self-assessment-questionnaire.pdf (opens in a new tab) ↩1 ↩2
- Brad Fabiny, “From Planning to Action: Insights on Clause 8 Implementation”, DQS (a certification body), 17 May 2024. https://www.dqsglobal.com/en/explore/blog/from-planning-to-action-insights-on-clause-8-implementation (opens in a new tab) ↩1 ↩2 ↩3
- ISO/IEC 27004:2016 catalogue record with abstract (stage 90.92), ISO, accessed 27 November 2026, https://committee.iso.org/standard/64120.html (opens in a new tab); and ISO/IEC DIS 27004 record (stage 40.60), https://committee.iso.org/standard/85920.html (opens in a new tab) ↩
- ISO 27001 Clause 10.1 guide reproducing the clause wording and Clause 10.2 guide summarizing it, High Table (a consultancy), accessed 27 November 2026. https://hightable.io/iso-27001-clause-10-1-continual-improvement/ (opens in a new tab); https://hightable.io/iso-27001-clause-10-2-nonconformity-and-corrective-action-essential-guide/ (opens in a new tab) ↩
- ISO/IEC 27003:2017 catalogue record (stage 90.92), ISO, accessed 27 November 2026, https://committee.iso.org/standard/63417.html (opens in a new tab); and ISO/IEC DIS 27003, Guidance for the application of ISO/IEC 27001:2022 (stage 40.00), https://committee.iso.org/standard/85919.html (opens in a new tab) ↩1 ↩2
- ISO/IEC JTC 1/SC 27 standards catalogue (ISO/IEC DIS 27003 at stage 40.00), ISO, accessed 27 November 2026. https://committee.iso.org/cms/live/live/en/sites/isoorg/contents/data/committee/04/53/45306/x/catalogue/p/1/u/0/w/0/d/0 (opens in a new tab) ↩
- NF38, Transition Requirements for ISO/IEC 27001:2022, Issue 02, Irish National Accreditation Board (INAB), March 2023. https://www.inab.ie/inab-documents/notifications/transition-requirements-for-iso-27001-2022.pdf (opens in a new tab) ↩
- 32 CFR Part 170, Cybersecurity Maturity Model Certification (CMMC) Program, § 170.14, Code of Federal Regulations (revised as of 1 July 2025), govinfo. https://www.govinfo.gov/content/pkg/CFR-2025-title32-vol1/pdf/CFR-2025-title32-vol1-part170.pdf (opens in a new tab) ↩

SecSIG